PROJECTS

On-going Projects

Corum - Merzifon High Speed Railway Project

     Modeling of 13 tunnels and entrance and exit portals and preparation of application projects within the scope of survey project and engineering services of Corum Merzifon high speed railway line of 102 km. 14 km tunnel design in total. Preparation of the geotechnical report for the route.

Completion 85%

Malatya - Elazig High Speed Railway Project

     Modeling of 10 tunnels and entrance and exit portals and preparation of application projects within the scope of survey project and engineering services of Malatya Elazig high speed railway  line of 96 km. 18 km tunnel design in total. Preparation of the geotechnical report for the route.

Completion 22%

Siirt - Kurtalan High Speed Railway Project

     Modeling of 13 tunnels and entrance and exit portals and preparation of application projects within the scope of survey project and engineering services of Siirt Kurtalan high speed railway  line of 26 km. 6 km tunnel design in total. Preparation of the geotechnical report for the route.

Completion 16%

Tarsus - Pozantı Highway Project

     Tarsus – Pozantı state road line of the 1.5 km-long Şehitler Tunnel static and geotechnical calculations and preparation of implementation projects. Preparation of the route geotechnical reports.

Completion 87%

World Trade Center Amsterdam

    World Trade Center Amsterdam 125,000 m2 of office space, located in the centre of Amsterdam Zuidas. Project consultant – Quantity take off control and calculations.

Completion 63%

Completed Projects

Tortum Uzundere Distinction - Narman Province Road Surveying and Project Consultancy Service Procurement

    In order to improve the geometric standards of the road between Tortum-Uzundere and Narman district in Erzurum. – Within the scope of the Narman Provincial Road project, 4.5 km long Şehitler Tunnel static and geotechnical calculations and preparation of implementation projects are completed.

Completion 100%

Buca-Onat Street and Intercity Bus Terminal and Periphery Connection-Tunneling (2nd Stage) Consultancy and Engineering Services

     Making calculations of Onat Tunnel exit portal zone and tunnel outlet body and preparation of application projects.

Completion 100%

North Ring Road (Erzurum-Ağrı State Highway) Nenehatun Tunnel Crossing Surveying and Consultancy Services

     Nenehatun Tunneled Crossing Project and Consultancy Services for the North Ring Road (Erzurum-Ağrı State Highway). Preparation of a 4 km long Nenehatun Tunnel for static and geotechnical calculations.

Completion 100%

Acwa Power Steel Warehouse Design

     Preparation of necessary structural improvement projects to determine the deformation tolerances of the existing steel structure within the ACWA Power Plant.

Completion 100%

Armutlu-Gemlik Provincial Road Project

    Construction of 495 m long T-14 Tunnel for Armutlu-Gemlik provincial road, static and geotechnical calculations and preparation of application projects.

Completion 100%

Balıkesir Edremit State Highway Evciler Variant Surveying And Project Consultancy

   In order to meet the increasing traffic needs of Balıkesir Edremit State Highway which is within the boundaries of the 14th Regional Directorate of Highways and to increase existing road standards, making the Static – Geotechnical calculations of the Evciler Tunnel with 171 m long left tube and 160 m long right tube, and preparation of implementation projects.

Completion 100%